- Finish sheathing the house (front porch, upstairs and a lot of patch work)
- Boxed in the upstairs porch, insulated it, sheathed it and started wrapping it
- Framed part of a bathroom, put up concrete board and did some electrical
- Pulled out 5 window (3 small, a medium and a big 3-panel window)
- Reframed around 4 of the windows and completely installed them
- covered the big window (until they get a replacement)
- sealed and wrapped 1/2 the house
- pulled out some fence posts
It was a great week for the youth, the leaders and the home owners.
No comments:
Post a Comment